ZTC logo

Your Timber House Starts Here

Prefabricated timber homes designed for comfort, energy efficiency and fast construction.

Why Choose Timber Construction

Fast Construction

Structural shell assembled in 3–5 days per floor. Weather-tight in weeks, not months, so interior works can start earlier and your move-in date comes sooner.

Factory-Built Precision

Every element is CNC-manufactured in our factory to ±1mm tolerance. Panels arrive ready to assemble, no on-site cutting, no waste, no delays.

Sustainable by Nature

FSC-certified timber, cellulose and wood fibre insulation, and formaldehyde-free adhesives. A home that is good for you and for the planet.

34+ Years of Experience

Since 1991, we have completed 350+ projects across 14 European countries. Every home we build reflects decades of expertise and a personal approach.

Built Across Europe

From Latvia to Norway, Sweden, the Netherlands, Switzerland and beyond - our teams deliver and assemble timber homes across the continent.

CE Certified Quality

All building kits carry CE marking under ETA-21/0014 and comply with Eurocodes. Ready for building inspection in any EU/EEA country without regulatory surprises.

The Process

How The Process Works

01

Project Assessment

Send us your drawings or concept. We assess structural feasibility and provide a preliminary budget range within 10 business days. No cost, no obligation.

02

Fixed-Price Proposal

Fixed pricing for the entire scope — from production to assembly. Prices are locked upon signing with no escalation clauses and no hidden costs.

03

Engineering & Production

Production drawings are prepared and your project enters CNC manufacturing. You receive progress updates throughout the production run.

04

Logistics & Delivery

Panels are loaded in assembly sequence and delivered on schedule. Latvia to most EU destinations in 2–5 days.

05

On-Site Assembly

ZTC crew assembles the structural shell on site. Weather-tight closure follows immediately and interior works can start weeks earlier than with traditional construction.

06

Handover & Documentation

As-built drawings, CE certification, warranty certificate and airtightness test results. Full documentation package ready for building inspection.

What's Included in Your Timber House

Insulated Wall, Floor & Roof Panels

Factory-manufactured structural panels with cellulose or wood fibre insulation. U-value from 0.12 W/m²K as standard.

Windows & Exterior Doors

High-quality windows and doors factory-fitted into panels before delivery are ready to install on site.

Facade & Roofing Materials

Facade cladding and roofing materials included as standard. A wide range of finishes available to match your design.

CE Documentation & Certification

Full CE marking under ETA-21/0014, structural engineering package and all compliance documentation for building inspection.

Transport & On-Site Assembly

Panels delivered in assembly sequence and installed by ZTC's own experienced crews. Structural shell complete in 3–5 days per floor.

Warranty & As-Built Documentation

Warranty certificate, airtightness test results and as-built drawings included. Optional extended 5-year warranty available.

ZTC awards and recognition

Awards & Recognition

Awards

  • 2025

    3rd Place - Latvian Construction Annual Award 2025, Timber Building (Office Building, Jelgava)

  • 2025

    1st Place - Sustainability in Architecture, Construction and Design in the Baltics, Timber Building (ZTC Office Building, Jelgava)

  • 2024

    3rd Place – Best Building of the Year in Latvia 2024, Timber Building ("Panorama" Private Housing Estate, Norway)

  • 2024

    3rd Place – Latvian Construction Annual Award 2024, Timber Building ("Panorama" Private Housing Estate, Norway)

  • 2023

    Commendation – Best Building of the Year in Latvia 2023, Timber Building (Private House, Norway)

  • 2021

    Jelgava City Highest Honour - Director Māris Avotiņš, Latvia Independence Day

  • 2020

    Socially Responsible Company Award - Jelgava Region

  • 2020

    Most Employee-Friendly Company - Jelgava District

  • 2019

    LBS Diamond Award — Best Building Abroad (Multi-functional building, Nacka, Sweden)

Project References

See How We Build

From factory production to completed homes - watch our timber construction process.

ZTC Factory

ZTC Factory

Factory manufacturing process

Assembling a Prefabricated Timber Frame House

Assembling a Prefabricated Timber Frame House

On-site installation - from panels to weather-tight shell

 Private House Assembly - Netherlands

Private House Assembly - Netherlands

Full installation timelapse - panels to completed structure

European Presence

Projects Across Europe

Loading map...

Active Markets

Total486+
Price estimate

House price calculator

Estimate the approximate cost of your timber house in just 2 minutes

  1. Basic Info
  2. House shape
  3. Energy level
  4. Window type
  5. Glazing Amount
1 / 5

Total House Area (m²)

Total gross floor area of the house including all floors.

Example: A 2-floor house with 100 m² per floor = 200 m² total.

120
square meters
80 m²350 m²

Number of Floors

Select how many floors your house will have

Calculate priceView projects