This energy-efficient timber frame house, manufactured at the ZTC production facility, is a great example of how off-site construction can significantly reduce overall building time. The prefabricated wall and roof panels were fully completed before the foundation was even ready, allowing the ZTC team to assemble and install the structure quickly and precisely on-site.
Using precise engineering, a CLT floor system with a steel frame, and rapidly manufactured panels, the assembly in the Netherlands was completed in less than two months.